A Step-by-Step Guide to Installing Resin Bound Paths: From Planning to Completion

Introduction: Resin-bound paths have gained popularity for their durability, aesthetic appeal, and low-maintenance qualities. If you’re considering enhancing your outdoor space with a beautiful and functional resin-bound path, you’re in for a rewarding project. In this comprehensive guide, presented by Resin Drives Tunbridge Wells, we’ll take you through the step-by-step process of installing resin-bound paths, from meticulous planning to the satisfying completion of your project.


Step 1: Planning and Design

  • Site Assessment: Evaluate the area where you intend to install the resin-bound path. Consider factors such as slope, drainage, and the overall design of your landscape.
  • Material Selection: Choose the colour and texture of the resin-bound aggregate that complements your surroundings. Resin-bound paths offer a wide range of choices to match your aesthetics.

Step 2: Site Preparation

  • Clear the Area: Remove any existing vegetation, debris, or old path material to create a clean surface.
  • Excavation: Depending on the depth of your path, excavate the area to the appropriate depth, considering the layers that will be added later.

Step 3: Base Preparation

  • Sub-Base: Lay a solid sub-base of compacted aggregate to provide stability and drainage. Ensure proper compaction and a smooth surface.
  • Edge Restraints: Install edge restraints such as timber or metal edging to contain the resin-bound mixture and prevent spreading.

Step 4: Mixing and Application

  • Resin Bound Mix: Prepare the resin-bound mix by combining the chosen aggregates with the resin binder. Use specialised equipment to achieve a consistent mix.
  • Application: Pour the mixed resin-bound aggregate onto the prepared sub-base. Spread it evenly to the desired thickness using trowels or specialised tools.
  • Tamping and Leveling: Use a tamping machine or roller to compact the mixture and ensure a flat surface.

Step 5: Finishing Touches

  • Smooth Finish: Smooth the surface using trowels or floats, ensuring an even texture and a professional finish.
  • Curing: Allow the resin-bound mixture to cure for the recommended time. This usually takes a few hours, but curing times vary based on environmental conditions.

Step 6: Cleaning and Sealing

  • Surface Cleaning: Using a blower or brush, remove loose aggregates and debris once the path is fully cured.
  • Sealing: Apply a protective sealant to enhance the longevity and appearance of your resin-bound path. The sealant also adds a glossy finish.

Step 7: Enjoying Your Path

  • Unveil Your Creation: Once the sealant is dry, your resin-bound path is ready for use. Enjoy the beauty and functionality it adds to your outdoor space.


Conclusion: Installing a resin-bound path involves a series of carefully orchestrated steps, each contributing to the path’s longevity, durability, and visual appeal. From meticulous planning to the final coat of sealant, each step is vital in creating a stunning and functional addition to your landscape. Resin Drives Tunbridge Wells understands the intricacies of resin-bound path installation and can provide professional guidance and expertise to ensure your project’s success. By following this step-by-step guide, you’ll be on your way to enjoying a beautiful, low-maintenance path that enhances your outdoor space for years to come.

Call us on: 01892 481881
Click here to find out more about Resin Drives Tunbridge Wells
Click here to complete our contact form and see how we can help with your driveway needs.

This is a newly installed tar and chip driveway installed by Ipswich Driveway Solutions

Similar Posts